Here you will find a selection of the most interesting content related to our activities. This section includes our projects that have left a special mark, awards and recognitions that confirm our efforts, and other special features that we would like to share with you. Feel free to take a look!
Projects

For MRO Solinair hangar, we prepared an Explosion Risk Assessment (EEO PZI and PID) and a Fire Safety Plan during the PGD and PZI phases, and we also prepared a Fire Safety Statement (PID).

Design, construction, and fire safety supervision of thermal power plant Block Unit 6 at TEŠ.

Šentvid pri Stični Children’s Hospital. Preparation of the Fire Safety Plan and the PID Fire Safety Report.

Project management, design, supervision throughout construction, and obtaining the occupancy permit for the MRO Hangar at Adria Tehnika.

Fire coating testing in the ZAG laboratory. Coating for steel profiles EI 60.

Fire sealing of penetrations through the boundaries of a fire compartment.

MRO Hangar Solinair - Built-in exhaust windows.

Institute of Oncology Ljubljana – We have prepared a Fire Safety Plan for the construction phase PZI according to Article 8 of the Rules – extension of the existing block H by two floors and a new block R will be built in place of the existing import into the garage.

Orkoplast d.o.o. Trebnje - Due to the lack of space in the existing building, the investor decided to build a new facility. The new construction followed the requirements set out in the Fire Safety Plan, which was prepared for the planning phase for obtaining building permit DGD and PZI construction phase, and monitored the construction until the successfully confirmed PID Fire Safety Statement and the completion of the technical inspection.

Orkoplast d.o.o. Trebnje - The building is parallel to a previously existing building on the neighboring plot of the same owner. Thus, the entrances are directed towards the existing structure. Building with floor dimensions of 120.9 m x 40.9 m built on the floor of PT + I.ND total approx. 5000 m2

Tapro d.o.o. - We approached the project at the wishes of the investor during construction. The Basic Fire Safety Plan we was upgraded with the measures in the Fire Safety Plan of the PZI, which gave requirements adapted to technological solutions and created new conditions for upgrading other plans (architectural, mechanical, electrical and other necessary plans).

Tapro d.o.o. - Architectural solution with a remote communication staircase connected to the corridors and floors of the business building. Consistent planning and implementation has led us to fire-appropriate solutions, safe and comfortable new business premises and confirmation of the PID Fire Safety Statement.
ZAPS award 2024
We are proud to have actively participated in the award-winning C-Tower project, where we were responsible for planning and implementing fire safety measures.
You can find out more about the project at the link below:

Image source: zaps.si